Furuno SC-60 Manuel D’Utilisation

Page de 106
2. INSTALLATION 
 
 
 2-9
2.3 
Installing the Processor Unit 
The processor unit should be mounted aligned with the ship’s fore-and-aft line. It 
can be mounted on the deck, bulkhead, or on the underside of a desk. Choose a 
mounting location which allows you to easily view the power lamp on the top of 
the unit and which is within 
±
2.5
°
 of the ship’s fore-and-aft line. 
 
2.3.1 Deck 
mount 
1.  The processor unit is factory adjusted for deck mounting. Fasten the 
processor unit to the mounting location with tapping screws (5 x 20, 4 pcs.). 
The unit can be oriented in one of the directions shown in the figure below. 
After the unit is installed, you will specify the mounting method from the 
menu.  
Bow
Stern
Stern
Stern
Stern
Port
Starboard
Mounting Method: "Floor" 
                            (Deck)
Mounting Direction: A
Mounting Method: "Floor" 
                            (Deck)
Mounting Direction: B
Mounting Method: "Floor"
                             (Deck)
Mounting Direction: C
Mounting Method: "Floor"
                             (Deck)
Mounting Direction: D
Bow
Port
Starboard
Bow
Port
Starboard
Bow
Port
Starboard
Name plate
Connectors
Reference Direction
POWER switch
(power lamp)
Processor Unit, top view
Mount processor unit 
so reference
direction is within 
±
2.5
°
 of
fore-and-aft line.
DIRECTION "A" 
DIRECTION "B" 
DIRECTION "C" 
DIRECTION "D" 
 
Processor unit orientation, deck mounting 
2.  Fasten the ground wire between the ground terminal on the processor unit 
and the ship’s hull.