Chief Personal Lift SL220 Manuel D’Utilisation

Page de 20
Installation Instructions
SL220
13
Adjustments
1.
Adjust projector left or right by loosening the wing nuts on
the SL220 cross bracket. (See Figure 22)
2.
Slide the SL220 cross bracket to the left or right as required.
3.
Tighten wing nuts. (See Figure 22)
Figure 22
4.
Adjust projector forward or backward by loosening two
screws on each side of SL220. (See Figure 23)
5.
Slide projector forward or backward as required.
6.
Tighten two screws on each side of SL220. (See Figure 23)
Figure 23
7.
Any pitch, roll or yaw adjustments should be made following
instructions included with the RPA/RPM.
Connecting Control Wiring
1.
Use two-sided tape, or a similar attachment device to attach
the IR sensor (S) in a convenient location for your
installation.
NOTE:
Ensure that IR sensor "eye" has "line of sight" to the
remote control signal.
2.
Insert terminal block (R) into SL220. (See Figure 24)
3.
Connect control wiring following instructions included with
the third party automation and control equipment and user-
supplied switching devices, and information in Wiring Table
(See Table 4).
NOTE:
Any knockouts removed in the SL220 must be
replaced with a supplied rubber grommet (T).
4.
Feed the video and/or communications cables through the
knockouts in the rear or top of the lift and connect it to the
projector.
Figure 24
5.
OPTIONAL: Use appropriate projector cord (U or V) to
connect projector to IEC outlet on rear panel inside SL220.
(See Projector Shutdown Mode (Optional) section.)
IMPORTANT ! :
Select projector cord (U or V) suitable for
projector. If neither supplied cord is appropriate for projector,
use a projector cord that has an attachment plug on one end
that meets IEC-60320 and on the other end is appropriate for
use with the projector being used with the lift.
CAUTION:
SHOCK, INJURY OR DAMAGE TO
EQUIPMENT IS POSSIBLE! Avoid placing cables near
moving parts and pinch points to avoid damage to the cables.
Ensure there is enough slack in the cables to allow for up and
down movement of the lift.
6.
Secure cables as necessary using supplied mounting pads
(N) and cable ties (P).
2
(Top View shown)
1
3
SL220 Cross
    Bracket
Projector
SLB Bracket
4
6
5
WARNING:
All wiring should be
performed following all local codes and
ordinances.
2
      Dip switches
Insert terminal
block here
(labeled 1             8)