ADIC Time Clock 6-00028-01 Rev A Manuel D’Utilisation
Managing the AMASS File System
4-18
Utility Reference
6-00028-01 Rev A
List of Hardware Tests
The script runs the tests listed in the following table. These tests
can take a long time to complete if the storage device is large.
can take a long time to complete if the storage device is large.
Example
Make sure all the libraries are connected to the system and
running.
running.
Step 1.
Log in as
root
.
Group
Test
Name
Definition
Picker
Istat
Performs library inventory and sees if it has
changed
changed
Move*
Checks if picker can move media and read
barcode label
barcode label
Drive
Configured
Checks if drives are properly configured
* AMASS makes sure each drive can move media by loading and
unloading the last volume (for SCSI-attached libraries) or loading and
unloading the last barcoded-platter (for network-attached libraries) to the
drive.
The “last” volume or barcoded-platter is defined as what is listed by the
medialist
unloading the last volume (for SCSI-attached libraries) or loading and
unloading the last barcoded-platter (for network-attached libraries) to the
drive.
The “last” volume or barcoded-platter is defined as what is listed by the
medialist
utility. This last volume should be the Backup Volume. Just
make sure this volume is not a cleaning volume because a cleaning
volume does not return a “tape loaded status” to AMASS and thus
install_tests
volume does not return a “tape loaded status” to AMASS and thus
install_tests
will fail.
If you have more than one library configured for AMASS, this test is done
on each library.
on each library.
# su root