Beckett RWF40 CG15 Manuel D’Utilisation
33
CG15, CG25, CG50 Burner Manual
For the Operator
Test/Inspection
Frequency
Comments
Inspect area surrounding heating plant
Daily
Keep area clean and free of clutter
Inspect gas supply system for leaks
Daily
Use visual and electronic leak detection
Inspect appliance & piping for water leaks
Daily
Keep burner and controls dry at all times
Inspect gauges, indicators, monitors
Daily
Note condition. Replace defective parts
Check temperature and pressure levels
Daily
Compare to manufacturer’s specifi cations
Make visual inspection of fl ame
Daily
Look for changes in shape, size, and color.
Monitor burner start-up
Daily
Verify prompt ignition and fl ame stability.
Monitor stack temperature
Daily
Compare to start-up and trend level.
Test low water cutoff and alarm
Daily
Follow control manufacturer’s instructions &
procedures in ASME Boiler & pressure vessel Code,
Section VI - Recommended rules for care and
operation of heating boilers.
procedures in ASME Boiler & pressure vessel Code,
Section VI - Recommended rules for care and
operation of heating boilers.
Calculate fuel gas input fi ring rate
Weekly
Compare to appliance manufacturer’s Specifi cations
Check fl ame safeguard sequence of
operation.
operation.
Weekly
Follow control manufacturer’s instructions
Flame failure response & lockout timing.
Weekly
Follow control manufacturer’s instructions
Flame sensor signal level (if meter is hard-
wired)
wired)
Weekly
Compare to control manufacturer’s specifi cations
Main fuel gas valves
Weekly
Open high limit and verify cutoff operation
Inspect exhaust vent system for blockage
Weekly
Remove any restrictions
Inpect combustion air supply
Monthly
Remove any restrictions
Check high and low gas pressure interlocks Monthly
Follow control manufacturer’s instructions
Check safety valves
As needed
Follow control manufacturer’s instructions &
procedures in ASME Boiler & Pressure Vessel Code,
Section VI - Recommended Rules for Care and
Operation of Heating Boilers.
procedures in ASME Boiler & Pressure Vessel Code,
Section VI - Recommended Rules for Care and
Operation of Heating Boilers.
Table 5 - Periodic Inspection Sheet
Inspect Heating System
Regularly
Regularly
Lack of regular inspections and inadequate
maintenance could lead to equipment malfunction
and result in asphyxiation, explosion or fi re.
(Always follow the appliance manufacturer’s
recommended service instructions, when available.)
The following checklist is intended to be used
as a minimum reference guide only and does
not supersede or replace the heating appliance
manufacturer’s recommended service and
maintenance instructions or any code requirements.
Consult the installation and service instructions
provided by the individual control or component
manufacturer and carefully follow their directions.
Maintenance and testing may be required more
frequently due to dusty or severe operating conditions.
If unusual or questionable performance is observed,
shut the system down and contact your qualifi ed
service agency immediately.
recommended service instructions, when available.)
The following checklist is intended to be used
as a minimum reference guide only and does
not supersede or replace the heating appliance
manufacturer’s recommended service and
maintenance instructions or any code requirements.
Consult the installation and service instructions
provided by the individual control or component
manufacturer and carefully follow their directions.
Maintenance and testing may be required more
frequently due to dusty or severe operating conditions.
If unusual or questionable performance is observed,
shut the system down and contact your qualifi ed
service agency immediately.
y
y
y
y
y
Section: Maintenance and Service