Force10 Networks Force10 TeraScale E-Series E1200i Manuel D’Utilisation

Page de 105
Installing and Maintaining the E1200i System
23
This chapter provides instructions to rack mount your E1200i AC system into a standard 19-inch or 
23-inch equipment rack. It contains the following sections:
Unpacking the E1200i AC System
The E1200i AC system and components are shipped on a wooden pallet with Front Shipping cover. 
Remove the chassis from the shipping packaging and move the chassis with a hand cart, pallet jack, or fork 
lift to its rack. Do not unpack the power supplies, fan trays, air filter, or cards until the chassis is installed.
Chapter 4
Installing the AC Chassis
Warning: The E1200i AC shipping containers each weigh up to 400 pounds. The unpacked 
chassis and pallet weigh approximately 200 pounds. Do not attempt to lift or move the chassis 
without the use of a hand cart, pallet jack, or forklift.
Caution: Lift the E1200i AC chassis only with the handles provided or from the bottom. Lifting by 
the chassis shelves will cause chassis damage. Do not remove the shipping cover during the 
installation process. The cover prevents damage to the internal framework and EMI seals.
Warning:  Electrostatic discharge (ESD) damage can occur when components are mishandled. 
Always wear an ESD-preventative wrist or foot-heal ground strap when handling RPMs, SFMs, or 
line cards. After you remove the original packaging, place RPMs, SFMs, and line cards directly 
into the chassis, or on an antistatic surface.
Warning: Complete the chassis installation into the rack before you install any other component 
(fan trays, power supplies, line cards, RPMs, SFMs, cables).