Force10 Networks Force10 TeraScale E-Series E1200i Manuel D’Utilisation

Page de 105
Installing and Maintaining the E1200i System
61
This chapter provides instructions for powering up your E1200i AC or DC system after you have installed 
all the chassis components and made your power and network connections. It covers the following topics:
Preparation 
Before you supply power to your chassis, Force10 Networks recommends that you re-inspect your 
equipment rack and chassis. 
Verify that: 
The equipment rack is properly secured and grounded.
The chassis is bolted and secured into your equipment rack.
The chassis is grounded.
Each power supply module is properly installed and secured. 
The AC-Cord Retainer is installed, if applicable (AC systems).
The power switch is in the OFF position, if applicable (DC systems).
Power cables connect to a compliant remote power source.
Both fan trays are installed and secured.
All line cards, RPMs, and SFMs are properly installed and secured.
All chassis slots are filled. Blank panels and covers are installed in all empty slots.
Chapter 11
Powering Up
Note: Make sure that the switch on the remote power source is in the OFF position until you are ready to 
supply power to the chassis.
Danger: Leakage Current (High Touch Current): The AC power cords are secured to the power 
inlet using the provided bracket. The power cord plugs must be secured to the building outlets by 
the chassis installer or a qualified electrician.