Maytag UXD86DYS Manuel De Montage

Page de 36
8
INSTALLATION INSTRUCTIONS
Venting Methods
Determine which venting method is best for your application. 
Vent system can terminate either through the wall or floor.
Island Location
NOTE: For island locations, a front- or rear-mounted blower 
motor can also be mounted for right or left venting if needed for 
your application. Most island applications would still require the 
venting to be directed down through the floor.
Built-In Cabinet Locations
Island Location—Vent System Installed Under a Concrete 
Slab Using PVC Sewer Pipe
Front (Standard) Mounted Blower Motor
Rear Mounted Blower Motor
Calculating Vent System Length
3¼" x 10" (8.3 x 25.4 cm) rectangular vent is required from the 
blower motor box. It can be transitioned to 6" (15.2 cm) round 
vent if needed. 
Maximum Length of Vent System
Front (Standard)-Mounted 
Blower Motor
Rear-Mounted Blower Motor
A. Down vent
A. Down vent
B. Left vent
C. Right vent
A
A
B
C
A
A. Wall cap
B. 6" (15.2 cm) round metal vent
C. 16" (40.6 cm) maximum
D. 6" (15.2 cm) round PVC sewer pipe
E. 6" (15.2 cm) round metal vent transition with damper (supplied)
F. 6" (15.2 cm) round PVC coupling
G. Concrete slab
H. 6" (15.2 cm) round PVC sewer pipe
I. 6" (15.2 cm) round 90° PVC sewer pipe elbow
J. Tightly pack gravel or sand completely around pipe.
K. 6" (15.2 cm) round 90° PVC sewer pipe elbow
L. 6" (15.2 cm) round PVC coupling
M. 12" (30.5 cm) minimum
Vent
Length
6" (15.2 cm) round
35 ft (8.9 m)
3
¹⁄₄" x 10" (8.3 cm x 25.4 cm)
35 ft (8.9 m)
 
 
 
 
 
 
A
B
C
D
E
F
G
H
I
J
K
M
 
 
 
 
 
 
A
B
C
D
E
F
G
H
I
J
K
M