Monogram ZV925SLSS Manuel De Montage
20
STEP 5 INSTALL LOWER STRUCTURE
TO UPPER STRUCTURE
• Slide lower frame into
the upper frame. Match
the marked alignment
holes.
the marked alignment
holes.
• Secure the upper and
lower frame with 16
screws, 4 on each side
of the frame.
screws, 4 on each side
of the frame.
Installation Instructions
INSTALLATION—RECIRCULATING
STEP 6 INSTALL BLOWER/MOTOR
• Raise the blower/motor
piece toward the
assembled frame.
assembled frame.
• Carefully raise the motor
to the marked reference
point while making sure
the duct piece slips over
the blower outlet flange.
point while making sure
the duct piece slips over
the blower outlet flange.
• Secure the blower/motor
to the frame using 16
screws, 4 on each side.
screws, 4 on each side.
• Use tape to seal the duct
connection.