Multiquip GB114BS/BP Manuel D’Utilisation

Page de 46
GB114BS/BP GLOBUG LIGHTING SYSTEM • OPERATION AND PARTS MANUAL — REV. #3 (01/06/09) — PAGE 19
OPERATION/SHUTDOWN
Place the ON/OFF switch (Figure 12) on the ballast in 
3. 
the ON position.
Ballast On/Off Switch (On Position)
Figure 12. 
Notice that the balloon envelope will begin to deploy 
4. 
as soon as power is applied. 
The lamp should now be on. If the lamp is not on, 
5. 
check all connections and repeat steps 1 thru 4. If the 
lamp still does not come on, contact your nearest MQ 
service center.
The lighting system is now ready for use.
6. 
 NOTICE
ALWAYS Make sure ballast is securely mounted to  
a surface where it will not move, slip or fall. This will 
prevent severe damage to the ballast. 
BALLAST
ON
ON/OFF
SWITCH
SHUTDOWN
Place the ON/OFF switch on the ballast to the OFF 
1. 
position. The balloon should begin to defl ate and the 
lamp turns off.
If using a portable generator, shut-down the generator 
2. 
as referenced in the "Shutdown Section" of the supplied 
generator manual. ALWAYS place the main circuit 
breaker in the OFF position before turning off the 
generator.
If using a power source other than an AC generator, 
3. 
disconnect the ballast AC power cable from the power 
source.