Kobe Range Hoods CH7930SQB Manuel D’Utilisation

Page de 102
 
UNDER THE CABINET INSTALLATION – TOP VENT 
Preparation before Installation
NOTE:  TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE   
VENT OPENING. 
Decide the location of the venting pipe from the hood to the outside.  Refer to Figure 1. 
A straight, short venting run will allow the hood to perform more efficiently. 
Try to avoid as many transitions, elbows, and long run as possible.  This may reduce 
the performance of the hood. 
Temporarily wire the hood to test for proper operation before installing. 
Peel protective film off the hood (if any). 
For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler 
strips (not included) on each side.  Refer to Figure 2. 
Measure and create access opening for electrical wires under the cabinet. 
Cut the multi duct exhaust according to the size of the venting pipe.  Refer to Figure 3. 
                                   Figure 1                                                         Figure 2 
                                                                                                                               
         
     
     
               6
" Round Vent                       7" Round Vent                 3-1/4" x 10" Vent 
Figure 3