Metrologic Instruments MS7320 Manuel D’Utilisation

Page de 64
 
 
5
Figure 2: Keyboard Wedge Interfaces
I
NSTALLATION FOR 
K
EYBOARD 
W
EDGE 
I
NTERFACE
  
 
1.  Turn off the host system.  
 
2.  Disconnect the keyboard from the host. 
 
3.  Connect the PowerLink cable to the 10-pin 
KBW interface jack.  It is the 2
nd
 round 
opening from the left side of the MS7320
 
(see figure 2).
 
 
4.  Connect the “Y” end of the  
PowerLink cable to the keyboard  
and the keyboard port on the host.   
If necessary use the male/female  
adapter cable supplied with the scanner for 
proper connections. 
 
Before continuing verify that the  
PowerLink cable is connected to the  
appropriate interface jack on the scanner. 
An incorrect cable connection can cause 
communication problems or potential 
damage to the scanner. 
 
5.  Connect the external power supply 
to the power jack on the PowerLink cable. 
 
6.  Check the AC input requirements 
of the power supply to make sure 
the voltage matches the AC outlet.  
 
7.  Connect AC power to the transformer.  
The outlet should be near the equipment 
and easily accessible.  
 
8. Scan  the Load Keyboard Wedge Defaults 
bar code to configure the MS7320 for 
Keyboard Wedge communication. 
 
9.  Turn on the host system. 
 
10.  Snap on the cable cover. 
 
 
 
 
See SELV Power Source caution statement located on page 16 of this manual. 
 
Load Keyboard 
Wedge Defaults
 
³ 9 9 9 9 9 4