Ventilation and Combustion Air
Wall furnaces shall be installed in a location in which the facilities 
for ventilation permit satisfactory combustion of gas and proper 
venting under normal conditions.  In buildings of conventional 
frame, brick, or stone construction without tight storm windows 
and  doors,  infiltration  is  normally  adequate  to  provide  air  for 
combustion and draft hood dilution.
Where appliances are installed in confined and unconfined spaces 
within a building, the building being of unusually tight construction, 
air for combustion and ventilation must be obtained directly from 
outdoors or from such spaces that freely communicate with the 
outdoors.  Under these conditions, the confined and unconfined 
spaces shall be provided with two permanent openings, one near 
the top of the enclosure and one near the bottom; each opening 
shall have a free area of not less than one square inch (6,45cm
2
per 2,000 BTU hr. (.6KW/H) of total input.
Qualified Installing Agency
Installation and replacement of gas piping, gas utilization equipment 
or  accessories  and  repair  and  servicing  of  equipment  shall  be 
performed only by a  qualified agency.  The term “qualified agency” 
means any individual, firm, corporation or company which either in 
person or through a representative is engaged in and is responsible 
for  (a)  the  installation  or  replacement  of  gas  piping  or  (b)  the 
connection, installation, repair or servicing of equipment, who is 
experienced in such work, familiar with all precautions required 
and has complied with all the requirements of the authority having 
jurisdiction.
The installation must conform with local codes or, in the absence of 
local codes, with the National Fuel Gas Code, ANSI Z223.1/NFPA 
54,* Natural Gas and Propane Installation Code, CSA B149.1.
*Available from the American National Standards Institute, Inc., 11 West 42nd St., 
New York, N.Y. 10036.
Clearances
1.  In selecting a location for installation, it is necessary to provide 
adequate  accessibility  clearances  for  servicing  and  proper 
installation.
2.  The FAW-55 can be attached to the wall or recessed into the 
wall up to 4 inches (102mm) in depth.
3.  The wall in which the furnace is recessed has (0) zero (0mm) 
clearance to the furnace sides and top. 
4.  When using side discharge registers, SOR-1 or SOK-1, the 
furnace cannot be recessed into the wall.
5.  Clearance  to  sidewall  or  combustible  material  is  4  inches 
(102mm).
6.  Ceiling clearance is 7 1/2 inches (191mm).
7.  Floor and rear wall clearance is (0) zero inches (0mm).
8.  Clearance of 18 inches (457mm) is required to adjacent wall or 
combustible material when flush mounted SOR-1, side outlet 
register is used.
Before Installing Consider The Following Venting
1.  A  chimney  for  residential-type  or  low-heat  gas  utilization 
equipment  shall  extend  at  least  3  feet  (914mm)  above  the 
highest point where it passes  through a roof of a building and 
at least 2 feet (610mm) higher than any portion of building 
within a horizontal distance of 10 feet (3m).
INSTALLATION
2.  This furnace must not be connected to a chimney flue serving 
a separate solid-fuel burning appliance.
3.  Uninsulated  Single-Wall  Metal  Pipe  shall  not  be  used 
outdoors  in  cold  climates  for  venting  gas  utilization 
equipment.
4.  Attention!  This Fan Type Vented Wall Furnace is equipped 
with  a  vent  safety  switch.    In  the  event  of  spillage  of  flue 
products due to improper venting the vent safety switch will 
open, which results in the main burners to “shut off”.
Refer to Figure 1 and page 16 for additional information regarding 
U.L. Listed gas vent equipment.  
Installing Optional Side Outlets
Side outlet register, SOR-1 may be installed on one or both sides 
of the furnace at the required clearances of 18 inches (457mm) to 
adjacent wall or combustible material as shown in Figure 2.  
1.  Locate and cut the 5 1/2” (140mm) square opening in the cabinet 
side using the template from the kit, exposing the inner liner 
knock-out.
2.  Remove the knock-out.  
3.  Place the register on the 5 1/2” (140mm) opening with the 
louvers set for the desired direction and mark the mounting 
holes using the register as a template.  
4.  Drill (2) 1/8” (3mm) diameter holes in cabinet side and fasten the 
register in place with (2) #10 x 1” (25mm) screws provided.  
Side outlet kit,  10” (254mm) boot assembly with register, SOK-1 
for warm air discharge into an adjoining room may be installed on 
either side of the furnace at the required clearance of 4 inches to 
adjacent wall as shown in Figure 3A.  
1.  Locate and cut the 5 1/2” (140mm) square opening in the cabinet 
side using the template from the kit, exposing the inner liner 
knock-out.
2.  Remove the knock-out.  
3.  Using the inner and outer boots as hole templates, mark and 
drill (8) 1/8” (3mm) diameter holes in the inner liner and cabinet 
side.
4.  Using  Figure  3A  locate  and  cut  a  6  3/4”  (171mm)  square 
opening through walls.  
5.  Attach furnace to wall (see Attaching Furnace to Wall). 
6.  With furnace in place, after checking alignment of side outlet 
opening in wall and furnace, place the 9 3/8” x 9 3/8” (238mm 
x 238mm) side outlet wall plate over outer boot,  pass the outer 
boot through the wall and attach side outlet wall plate to furnace 
side of wall with (2) #10 x 1” (25mm) screws provided.  
7.  Fasten outer boot to the cabinet side with (4) #8 x 1/4” (6mm) 
screws provided.  
8.  Position and attach inner boot to inner liner with (4) #8 x 1/4” 
(6mm) screws provided.  
9.  Locate the register with its louvers positioned for the desired 
air discharge direction and mark the mounting holes using the 
register as a template.  
10.  Drill (2) 1/8” (3mm) diameter holes in the wall and fasten the 
register in place with (2) #10 x 1” (25mm) screws provided