Empire Products DVC-35IPT-1 Manuale Utente

Pagina di 24
13119-6-0107
 
 Page 7 
Locating Gas Supply
The gas line can enter the unit either through the floor or outside 
wall. The gas line opening should be made at this time. Location 
of the opening will be determined by the position of floor joists 
and the valve and union used for servicing.
Note: Never use plastic pipe. Check to confirm whether your local 
codes allow copper tubing or galvanized.
Note: Since some municipalities have additional local codes, it is 
always best to consult your local authority and installation code.
The use of the following gas connectors is recommended:
—  ANS Z21.24 Appliance Connectors of Corrugated Metal Tubing 
and Fittings
—  ANS  Z21.45 Assembled  Flexible Appliance  Connectors  of 
Other Than All-Metal Construction
The above connectors may be used if acceptable by the authority 
having jurisdiction. The state of Massachusetts requires that a flexible 
appliance connector cannot exceed three feet in length.
Figure 1 
Consult the current National Fuel Gas Code, ANSI Z223.1 CAN/
CGA-B149 (.1 or .2) installation code. 
Installing a New Main Gas Cock
Each appliance should have its own manual gas cock.
A  manual  main  gas  cock  should  be  located  in  the  vicinity  of 
the unit. Where none exists, or where its size or location is not 
adequate, contact your local authorized installer for installation 
or relocation.
Compounds used on threaded joints of gas piping shall be resistant 
to the action of liquefied petroleum gases. The gas lines must be 
checked for leaks by the installer. This should be done with a soap 
solution watching for bubbles on all exposed connections, and if 
unexposed, a pressure test should be made. 
Never use an exposed flame to check for leaks. Appliance must 
be disconnected from piping at inlet of control valve and pipe 
capped or plugged for pressure test. Never pressure test with 
appliance connected; control valve will sustain damage!
A gas valve and ground joint union should be installed in the gas 
line upstream of the gas control to aid in servicing. It is required 
by the National Fuel Gas Code that a drip line be installed near 
the gas inlet. This should consist of a vertical length of pipe tee 
connected into the gas line that is capped on the bottom in which 
condensation and foreign particles may collect. 
Figure 2
Method of Installing a Tee Fitting Sediment Trap
Pressure Testing of the Gas Supply System
1.  To  check  the  inlet  pressure  to  the  gas  valve,  a  1/8”    N.P.T. 
plugged tapping, accessible for test gauge connection, must be 
placed immediately upstream of the gas supply connection to 
the appliance.
2.  The  appliance  and  its  individual  shutoff  valve  must  be 
disconnected from the gas supply piping system during any 
pressure testing of that system at test pressures in excess of 1/2 
psig (3.5 kPa).
3.  The  appliance  must  be  isolated  from  the  gas  supply  piping 
system by closing its individual manual shutoff valve during 
any pressure testing of the gas supply piping system at test 
pressures equal to or less than 1/2 psig (3.5 kPa).
Attention! If one of the above procedures results in pressures in 
excess of 1/2 psig (14” w.c.) (3.5 kPa) on the appliance gas valve, 
it will result in a hazardous condition.
Recommended Gas Pipe Diameter
Pipe Length
Schedule 40 Pipe
Inside Diameter
Tubing, Type L 
Outside Diameter
Nat.
L.P.
Nat.
L.P.
0-10 feet
0-3 meters
1/2”
12.7mm
3/8”
9.5mm
1/2”
12.7mm
3/8”
9.5mm
10-40 feet
4-12 meters
1/2”
12.7mm
1/2”
12.7mm
5/8”
15.9mm
1/2”
12.7mm
40-100 feet
13-30 meters
1/2”
12.7mm
1/2”
12.7mm
3/4”
19mm
1/2”
12.7mm
100-150 feet
31-46 meters
3/4”
19mm
1/2”
12.7mm
7/8”
22.2mm
3/4”
19mm
GAS SUPPLY