Empire Comfort Systems 2 Manuale Utente

Pagina di 60
23552-4-0408
Page 28
Figure 42
See Horizontal Termination Page 29 and Vertical Termination 
Pages 34-35.
Figure 41
FRAMING AND FINISHING (continued)
Vertical Firestops (Figures 40, 41 and 42)
Vertical runs of this system which pass through ceilings require the 
use of ONE (1) ceiling firestop at the hole in each ceiling through 
which the vent passes.
Position a plumb bob directly over the center of the vertical vent 
component and mark the ceiling to establish the center point of the 
vent. Drill a hole or drive a nail through this center point and check 
the floor above for any obstructions such as wiring or plumbing 
runs. Reposition the appliance and vent system, if necessary, to 
accommodate ceiling joists and/or obstructions.
Cut a 10 inch x 10 inch hole through the ceiling, using the center 
point previously marked. Frame the hole with framing lumber the 
same size as the ceiling joists. (See Figure 40) If the area above the 
ceiling is NOT an attic, position and secure the ceiling firestop on 
the ceiling side of the previously cut and framed hole. (See Figure 
41) If the area above the ceiling is an attic, position and secure the 
firestop on top of the previously framed hole. (See Figure 42)
NOTE: Remove insulation from the framed area in the attic before 
installing the firestop and/or vent pipes.
Figure 40