York YOCC-YOHC 12-60 Manuale Utente

Pagina di 8
Y&G
XT2
Y&G
XT1
XT1
XT2
T3
E
1N
3
4
L N 1 2(N)
WHITE (T3)
BLACK (E)
Y&G
3
1
2
L
 N
3
1 2
L  N
XT1
XT2
T3
E
Y&G
XT2
XT1
T3
E
24000Btu/h (1 PHASE)
Air Conditioner Link-circuit
(For R-410A, Cooling & Heating)
24000-36000Btu/h (1 PHASE)
Air Conditioner Link-circuit
(For R-407C, Cooling & Heating)
Chart 21
3-core cable 3x2.5mm
2
1-core sheild wire 1x0.5mm
2
3-core cable 3x2.5mm
2
OUTDOOR UNIT
INDOOR UNIT
POWER:
220-240V~50Hz
3-core cable 3x2.0mm
2
12000 Btu/h (1 PHASE)
Air Conditioner Link-circuit
(For R-410A, Cooling & Heating)
18000 Btu/h (1 PHASE)
Air Conditioner Link-circuit
(For R-410A, R-407C and R-22,
Cooling & Heating)
Chart 20
3-core cable 3x2.5mm
2
1-core sheild wire 1x0.5mm
2
5-core cable 5x2.0mm
2
OUTDOOR UNIT
INDOOR UNIT
POWER:
220-240V~50Hz
Chart 18
❥✱
The Specifi cation of Power
Power supply
Switch/Fuse
(Available locally)
Power wiring (indoor)
Power linking wiring (Outdoor)
Ground wiring
Strong elec-signal link wiring
Weak elec-signal link wiring
Ground wiring
Indoor
Unit
Outdoor
Unit
•  Ground the air conditioner properly in case to affect its anti-interference function
Chart 19
1.5m~2m
Insulating
material
Downward
declivity lower
than 1/100
Bend
S shape
Put as deep as possible
(about 10cm)
Downward declivity
lower than 1/100
VP30
WIRING
❥✱
Attaching wiring
1. The air conditioner should use separate power supply with rated voltage
2. The external power supply to the air conditioner should have ground wiring,
which is linked to the ground wiring of the indoor and outdoor unit.
3. The wiring work should be done by qualifi ed persons according to circuit
drawing.
4. A leakage protector should be installed according to the National Standard
concerning electrical appliance.
5. Be sure to locate the power wiring and the signal wring well to avoid cross-
disturbance and their contact with connecting pipe or stop valve body.
6. The wiring attached to this air conditioner is 10m long. Be sure to prolong it
with wiring of the same type and proper length if necessary. Generally, do not
twist two wiring together unless the joint is soldered well and covered with
insulator tape.
7. Do not turn on the power until you have checked carefully after wiring.
TYPE
12000~18000 Btu/h
(Cooling&Heating)
24000-36000 Btu/h
(Cooling&Heating)
36000-60000 Btu/h
(Cooling&Heating)
POWER
PHASE
1-PHASE
1-PHASE
3-PHASE
FREQUENCY AND VOLT
220-240V~, 50Hz
220-240V~, 50Hz
380V 3N~, 50Hz
CIRCUIT BREAKER/FUSE (A)
20/16
40/25
40/20
INDOOR UNIT POWER WIRING (mm
2
)
3x2.5
5x2.5
INDOOR/OUTDOOR
CONNECTING
WIRING
(mm
2
)
GROUND WIRING
2.0
2.5
2.5
OUTDOOR UNIT
POWER WIRING
3x2.5
3x2.5
5x2.5
STRONG ELECTRIC
SIGNAL
5x2.0
(3x2.0)
3x2.0
(2x2.0)
3x2.0
(2x2.0)
WEAK ELECTRIC
SIGNAL
1-core sheild wire
1x0.5mm
2
2-core sheild wire
2x0.5mm
2
TYPE
12000~18000 Btu/h
(Cooling Only)
24000-36000 Btu/h
(Cooling Only)
36000-60000 Btu/h
(Cooling Only)
POWER
PHASE
1-PHASE
1-PHASE
3-PHASE
FREQUENCY AND VOLT
220-240V~, 50Hz
220-240V~, 50Hz
380V 3N~, 50Hz
CIRCUIT BREAKER/FUSE (A)
40/25
40/20
40/25
INDOOR UNIT POWER WIRING (mm
2
)
3x2.5
3x2.5
5x2.5
INDOOR/OUTDOOR
CONNECTING
WIRING
(mm
2
)
GROUND WIRING
2.0
2.0
2.0
OUTDOOR UNIT
POWER WIRING
3x2.0
5x2.0
STRONG ELECTRIC
SIGNAL
3x2.0
1x2.0
1x2.0
WEAK ELECTRIC
SIGNAL
❥✱
Wiring Chart
Installing wiring chart, refer to link circuit chart for details.
  CAUTION: When wiring, please choose the corresponding chart, or it may
cause damage.
Timber over the beam
Roof beam
Ceiling
Hanging screw bolts
Chart 1
Chart 2
(Blade shape insertion)
(Slide insertion)
Steel bar
Embedding screw bolt
(Pipe hanging and embedding
screw bolt)
Chart 3
Hanging screw bolt
Supporting
angle steel
Hanging bolts
Chart 4
CONNECT THE DRAIN PIPE
1. Install indoor unit drain pipe
The outlet has PTI screw thread, Please use sealing materials and pipe sheath
(fi tting) when connecting PVC pipes.
Cautions
2. Drainage test
•  Check whether the drainpipe is unhindered
•  New built house should have this test done before paving the ceiling.
3. Drain Elbow Installation
  Fit the seal into the drain elbow, then insert the drain elbow into the base pan
hole of outdoor unit, rotate 90° to securely assemble them. Connect the drain
elbow with an extension
drain hose (Locally purchased),
in case of the condensate
draining off the outdoor unit
during the heating mode.
(Refer to Chart 17)
Wooden construction
New concrete bricks
For Original concrete bricks
Steel roof beam structre
Put the square timber traversely over
the roof beam, then install the hanging
screw bolts. (Refer to Chart 1)
Inlaying or embedding the screw bolts.
(Refer to Chart 2)
Use embedding screw bolt. (Refer to
Chart 3)
Install and use directly the supporting
angle steel. (Refer to chart 4)
Chart 17
The base pan hole
of outdoor unit
The base pan
hole of outdoor
Drain elbow
Seal
Seal
Drain elbow
•  The drain pipe of indoor unit must be heat insulated, or it will condense dew,
as well as the connections of the indoor unit.
•  Hard PVC binder must be used for pipe connection, and make sure there is no
leakage.
•   With the connection part to the indoor unit, please be noted not to impose
pressure on the side of indoor unit pipes.
•  When the declivity of the drain pipe downwards is over 1/100, there should not
be any winding.
•  The total length of the drain pipe when pulled out traversely shall not exceed
20m, when the pipe is over long, a prop stand must be installed to prevent
winding.
• Refer  
to  
the fi gures on the right for the installation of the pipes.