FG37 Regency Rear Flued Room Sealed Freestanding Gas Heater
11
Diagram  5
Diagram  4
Below  Grade  Snorkel  Installation
If the Snorkel Termination must be installed
below  grade,  i.e.  basement  application,
proper drainage must be provided to pre-
vent water from entering the Snorkel Ter-
mination.  Refer  to  Dura-Vent  Installation
instructions for details.. Do not attempt to
enclose the Snorkel within the wall, or any
other  type  of  enclosure.
4) Install wall penetration heat shield in the center
of the 9-1/2" (241mm) round hole and attach
with  wood  screws.  The  four  wood  screws
provided should be replaced with appropriate
fasteners for stucco, brick, concrete, or other
types of sidings. Dia. 3.
NOTE: For  Snorkel  terminations    in  ABOVE
grade  installations,  follow  national  or
local  code  requirements.
Diagram  3
5) If  installing  termination  on  a  siding  covered
wall,  a  vinyl  siding  standoff  or  furring  strips
must be used to ensure that the termination is
not recessed into the siding.  Dia. 3.
6) Take the Riser Vent terminal and separate the
Backing  Plate  from  the  Riser  Vent  Front  by
removing 8 screws as shown in diagram 4.
7) Install the Backing Plate into the wall
penetration heat shield and attach us-
ing 4 screws. Dia. 4.
8) Connect  all  pipe  sections  to  unit  and
install into wall:
a) Measure pipe length required and
cut to length. Hint: use the cut end
of  the  6-5/8"  (168mm)  dia.  outer
pipe at the flue terminal end.
b) Push the pipe sections completely
together, the minimum pipe overlap
is 1-1/4" (32mm).  Secure all outer
pipe  joints  by  using  at  least  two
screws.  Locate  the  screws  at  the
bottom of the pipe so that the screw
heads are hidden on the final instal-
lation.  Apply  sealant  "Mill-Pac"  to
inner pipe and high temp silicone
sealant or "Mill-Pac" to outer pipe on
every  joint.
Hint: Apply sealant to female end.
c) Before connecting the flue pipe to
the  flue termination, slide the black
decorative wall thimble cover over
the  flue  pipe,  then  slide  the  Wall
Penetration Heat Shield (Part # 946-
202) over the flue pipe. Dia. 3.
d) Slide the appliance and flue assem-
bly  towards  the  wall  carefully  in-
serting the flue pipe into the riser
vent terminal assembly. It is impor-
tant that the flue pipe extends into
the Riser Vent Backing Plate a suf-
ficient distance so as to result in a
minimum pipe overlap of
1-1/4  inches  (32mm).  Secure  the
connection  between  the  flue  pipe
and the flue cap by attaching the
two  sheet  metal  strips  extending
from the Riser Vent Backing Plate
into the outer wall of the flue pipe.
Use two aluminum screws provid-
ed to connect the strips to the pipe
section. Bend any remaining por-
tion  of  the  sheet  metal  strip  back
towards  the  flue  cap  and  cut  off
any excess, it will be concealed by
the decorative wall thimble cover.
See diagram 5.
8) Slide the decorative wall thimble up to the
wall  surface  being  careful  not  to  scratch
the paint.  See diagram 5.
9) Back outside: Apply sealant to the 4" (102mm)
inner flue and slide the Riser Vent Front into
the Backing Plate and fasten with 8 screws.
IMPORTANT:
When connecting the pipe to the Riser
Vent,  apply  Mill-Pac  to  the  inner  pipe
on  the  Riser  Vent  Terminal,  around
the  bead.  Ensure  that  the  flue  pipe  is
pushed past the bead for a secure fit.
INSTALLATION
10) Seal  around  the  outer  edge  of  the  Riser
Vent Backing Plate.