GE C11 Manuale Utente

Pagina di 98
-24- 
2)  External operation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
*1  
Use this connection to start, stop the operation and set the frequency with external signals.  0 to +10V dc can be set while 
function F01 is set to 1 and 4 to 20mA can be set while function F01 is set to 2.  Set function F02 to 1~4. 
*2  Remove the jum per between the P1 and P(+) terminals before connecting the optional power-factor correcting DC reactor. 
 *3  Connect the surge absorber in parallel to coils (such as coils of the magnetic contactor and solenoid) near the drive. 
 *4  Use twisted or shielded wire as control signal wire.  Connect the shield to the ground terminal. 
12 
13 
FW
11 
X1
 
REV
 
CM 
X3
 
30C 
30B 
30A 
X2
 
L2/S
 
L1/R
 
L3/T
 
P1
 
P(+)
 
N(-)
 
P(+)
 
M
FM 
C1 
P1
 
P(+)
 
When power-factor correcting 
DC reactor is used
 
E
 
MCCB 
*2
 
Frequency setting POT (VR) 
+10Vdc
 
250
Ω
 
22k
Ω
 
Pulse output 
 
0V
 
0V
 
Reverse operation 
command 
Forward operation 
command Forward 
Analog monitor
Alarm output for any fault
 
To 11 terminal 
Analog meter
 
G 
G 
+24 to +27Vdc 
Figure 2-3-10  Wiring diagram of externaoperation 
To ground terminal
 
To ground terminal
 
Frequency setting current 
input 
(4 to 20mAdc)
 
Frequency setting voltage 
input   
(0 to +10Vdc)
 
3-phase  
230V input series
200 to 230V 
50/60Hz 
X3
 
EXT
 
INT
 
PLC
 
SW7 
4.7k
Ω
 
Single-phase 
200V input series
 
200 to 240V  
50/60Hz 
STOP
 
RUN
PRG 
RESET
 
FUNC 
DATA
 
INT
 
EXT
 
PLC
 
X3
 
L1/L 
L2/N 
MCCB 
3~ 
Fuse