Servis-Rhino 2412 Manuale Utente

Pagina di 100
OPERATION
2412   01/11
Operation Section 4-44
© 2011 Alamo Group Inc.
OPERA
T
ION
PROBLEM
POSSIBLE CAUSE
REMEDY
*With bucket dumped,
Dampening office in unloading
Remove unloading spool and clean
boom is slow in starting
spool is plugged.
dampening orifice.
*Bucket does not move
Set screw is screwed in all
Readjust set screw to achieve
in self-level
the way.
proper flow split.
Dampening orifice in unloading
Remove unloading spool and clean
spool is plugged.
dampening orifice.
Ports A and B are plumbed
Reverse hoses on ports A and B of
backwards.
self-level valve. 
*Bucket curls in self-level
Ports C and D are plumbed
Reverse hoses on ports C and D of 
backwards.
self-level valve.
*External leakage
Damaged seals.
Remove leaking component;
replace seals.
Excessive wear on bucket
Bucket is riding on cutting edge
Use boom “FLOAT” position or 
cutting edge
instead of wear runners.
bucket level indicator to ensure
bucket rides on wear runners.
*Bucket dumps faster than
Set screw is out of adjustment.
Readjust set screw to achieve
boom raises. Too much
proper flow split.
self-level
Flow divider spool is stuck
Remove flow divider spool and
towards port B.
inspect for damage.
Flow divider spool is installed
Remove spool and install with
wrong.
internal orifice toward port B.
*External leakage
Damaged flow divider plug
Remove plug and replace damaged
o-ring.
o-ring.
Damaged plunger plug o-ring.
Remove plug and replace damaged
o-ring.
Damaged unloading spool plug
Remove plug and replace damaged
o-ring.
o-ring.
Damaged adjustment cap o-ring.
Remove adjustment cap and replace
damaged o-ring.
Leakage around set screw.
Remove adjustment cap and replace
damaged o-ring on set screw.
* Loaders with optional self-leveling valve.