American Power Conversion AP9617 Manuale Utente

Pagina di 26
Installation and Quick Start
7
Installation in a UPS
Step 2: Install 
the Network 
Management 
Card
If you are installing the Management Card in a Symmetra UPS 
that uses more than one 
APC
 management product, see 
Installation of Multiple Management Cards, a copy of which 
came with the Management Card. You must install the APC 
management products in the correct order for them to operate 
properly.
1. Use the same screws that hold the slot cover in place to 
secure the Management Card in the 
UPS
 card slot.
2. Connect a network interface cable to the 10/100Base-T 
network connector on the Management Card.
3. Reconnect the 
UPS
 to its input power source.
4. Turn on the 
UPS
.
Caution
The Network Management Card is sensitive to 
static electricity. When handling the 
Management Card, touch only the end plate 
while using one or more of these electrostatic-
discharge devices (ESDs): wrist straps, heel 
straps, toe straps, or conductive shoes.