American Power Conversion InfraStruXureTM System Manuale Utente

Pagina di 100
Appendix A : System Operation
74
InfraStruXure System—Installation and Start-Up
3. Set the Battery Enclosure DC Disconnect circuit 
breaker to the OFF position.
4. Pull out all battery units in the Battery 
Enclosures to the red battery disconnect line.
5. Set the Main Input switch (A), and, if 
applicable, the Q10 Bypass Input switch (B), 
and Cross Tie Output circuit breaker (X) on the 
PDU to the OFF position.
6. Open (turn OFF) the Q1Q2, and Q3 circuit 
breakers on the PDU.
7. Set the upstream main input, and, if applicable, 
the bypass input and cross tie utility circuit 
breaker to the OFF or Locked Out position.
A
B
X