D-Link DGS-1224T Manuale Utente

Pagina di 8
 
 
Setup The DGS-1224T Gigabit Smart 
Switch 
The setup of the Switch can be performed using the following steps: 
A. 
Install the DGS-1224T in a fairly cool and dry place. See Technical 
Specification for the acceptable operation temperature and humidity 
ranges. 
B. 
Install the DGS-1224T in a site free from strong electromagnetic 
field generators (such as motors), vibration, dust, and direct 
exposure to sunlight. 
C. 
Leave at least 10cm (about 4 inches) of space at the front and rear 
of the hub for ventilation. 
D. 
Visually inspect the DC power jack and make sure that it is fully 
secured to the power adapter.  
E. 
Install the DGS-1224T on a sturdy, level surface that can support 
its weight, or in an EIA standard-size equipment rack. 
F. 
When installing the Switch on a level surface, attach the rubber feet 
to the bottom of each device.  The rubber feet cushion the hub and 
protect the hub case from scratching. 
 
 
Attach the adhesive rubber pads to the bottom 
 
 
 
Rack Mounting 
The DGS-1224T can be mounted in an EIA  standard-size, 19-inch rack,  
which can be placed in a wiring closet with other equipments.  Attach the 
mounting brackets to both sides of the Switch (one at each side), and 
secure them with the provided screws. 
 
 
Use the screws provided.  Then, use screws provided with the 
equipment rack to mount the Switch in the rack.