 Powering up the system and initial loading
 Page 307 of 456
Communication Server 1000M and Meridian 1
Large System Installation and Commissioning
Procedure 54
Turning DC power ON
1
Connect each DC rectifier to its associated AC outlet and set the breakers 
in the AC power panel to ON.
2
Turn the rectifiers ON one at a time. Wait 10 seconds between each 
rectifier. 
Note: Power up the Core columns last.
3
On the DC power source for each column, replace the distribution fuses 
or set the distribution breakers to ON. Do the Core columns last.
4
Set the blower unit breaker switch ON (the far left breaker in the rear of 
the pedestal).
5
Set the blower unit switch in the front of the pedestal to ON. Verify that the 
fan is running. On initial power-up, the blower rotates slowly. As the 
system heats up, the cooling fans turn faster.
6
Set the power supply switch in each module to ON. The green light will 
turn on after a few seconds. 
Note: If the module is equipped with a ringing generator, set the breakers 
or switches for both the power supply and the ringing generator to ON. 
The green LED on a ringing generator normally takes up to 90 seconds to 
light.
7
Repeat step 1 through step 5 for each column in the system. Start with 
Column 2 and continue until power is turned on in all the columns. Do the 
Core columns last. 
CAUTION
System Failure
If a problem occurs in any of the following steps, resolve 
that problem before continuing.
IMPORTANT!
Perform the following tasks for each column