Lucent Technologies 555-233-115 Manuale Utente

Pagina di 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-34
Standard Reliability 
5
3. Behind control carrier A of EPN cabinet 2:
Install a lightwave transceiver on cable connector at slot 2A02.
NOTE:
Attenuators may be required for single mode fiber using a 
300A Lightwave Transceiver
Connect a fiber optic cable to the transceiver just installed.
Route the cable to the cable tray and down, out of the cabinet, 
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of 
the cable tray at the built-in cable tie positions.
4. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on cable connector at slot 3A02.
NOTE:
Attenuators may be required for single mode fiber using a 
300A Lightwave Transceiver
Connect a fiber optic cable to the transceiver just installed.
Route the cable to the cable tray and down, out of the cabinet, 
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of 
the cable tray at the built-in cable tie positions.
Coil up the surplus fiber cable and place it in the cable manager.