Lucent Technologies 555-233-115 Manuale Utente

Pagina di 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN 
5-51
High Reliability 
5
Unpack and Inspect Expansion Control Carrier
1. Inspect the new J58890AF Expansion Control Carrier for any damage. 
Also verify that the backplane pins are not bent.
2. Place the expansion control carrier on the floor so that the rear of the 
carrier faces up.
3. Install the CFY1 current limiter (CURL) on the “A” carrier to the pin-field 
block marked “CURL.” Install the CURL with the components on the left.
4. At the rear connector panel, determine which connectors will have a cable 
attached, and install a 4B cable retainer on each of these connectors.
Install New Expansion Control Carrier A
1. Install the carrier in position “A” by aligning the plastic alignment tips on 
the top rear of the carrier with the screw holes in the cabinet. These 
alignment tips support the carrier while installing the screws. Ensure that 
the power cords are properly placed in the slots at the sides of the carrier.
2. Fasten the carrier into position with the 4 self-tapping screws saved from 
the removal of the old carrier.
!
CAUTION:
Carefully realign the threads on the self-tapping screws by turning 
them counterclockwise 1 turn before tightening them to avoid 
stripping the threads out of the framework.
3. Behind the carrier, replace the 2 screws saved from the removal of the old 
carrier.
4. Connect the “P2” and “P1” cables to the “A” carrier. See 
Snap the connector lock into place to ensure the connection is properly 
made.
5. Connect the “P1” cable to the “C” carrier. Snap the connector lock into 
place to ensure the connection is properly made.
6. Connect the 8 ground straps from the “D” carrier to the new “A” carrier 
See 
. These straps were left connected to the “D” carrier.
7. Connect the 8 ground straps from the “C” carrier to the new “A” carrier. 
These straps were left connected to the “C” carrier.
8. For an AC-powered system, install the 2 new carrier ground straps. One 
strap connects ground point “1” to the A-carrier frame (right side), and the 
other connects ground point “8” to the A-carrier frame (left side).
NOTE:
DC-powered carriers do not use these carrier ground straps.