Adding or Removing Cabinet Hardware 
6-35
Remove an EPN Cabinet from an Existing System 
6
3. Type change fiber link and press 
Enter
. The Fiber Link Administration 
screen appears. Use this screen to unadminister fiber links, each of which 
is identified by a fiber number. 
a. The 
Is one endpoint remoted via DS1 Converter 
complex?
 field must remain administered.
b. Remove the location of the TN570 and the TN574 or TN1654 circuit 
pack for both ENDPOINT-1 and ENDPOINT-2.
4. Scroll to screen 2.
a. Type no, as applicable, in each 
Facility Installed?
 field (A, 
B, C, and D). 
b. The 
Bit Rate:
 field must remain administered if other fiber 
connections associated with the facility will remain. 
c. The idle code in the 
Idle Code MSB (1) . . . . LSB (8):
 
field must remain administered. 
d. The 
Line Coding: 
field must remain administered. 
5. For a T1 site, proceed to 
. For an E1 site, proceed to 
.
T1 Installations Only
1. The 
Framing Mode:
 field is display only.
2. The 
DS1CONV-1 Line Compensation:
 and the 
DS1CONV-2 Line 
Compensation:
 fields are display only. 
3. Remove the 
Facility Circuit ID:
 from the facilities being 
unadministered, if used. Press 
Enter
.
4. A display similar to the following appears after the procedure is 
completed: 
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
E1 Installations Only
1. The 
CRC?
 field must remain administered.
2. The 
Line Termination:
 field is display only.
3. Remove the 
Facility Circuit ID
 information from the facilities being 
unadministered, if used. Press 
Enter
.
4. A display similar to the following appears after the procedure is 
completed: 
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.