Adding or Removing Cabinet Hardware 
6-38
Remove an EPN Cabinet from an Existing System 
6
c. In the 
DS1CONV Board Location
: field, remove the cabinet, 
carrier, and slot that identifies the physical location of DS1 
Converter circuit pack in the first endpoint of the duplicate fiber link. 
Endpoint-1’s duplicate along with Endpoint-2’s duplicate make up 
the duplicate fiber link called the B-PNC link.
d. The 
DS1CONV Board Type
: field is a display only field. 
e. The 
Is one endpoint remoted via a DS1 Converter 
Complex?
 field must remain administered if other fiber connections 
associated with the facility will remain. 
3. Scroll to screen 2.
a. Remove the DS1 Converter Facilities information. In the 
Facility 
Installed?
 field, type no for all facilities (A, B, C, and D) to be 
removed.
b. The 
Bit Rate
:
 field must remain administered. 
c. The idle code in the 
Idle Code MSB (1) . . . . LSB (8):
 
field must remain administered. 
d. The data in the 
Line Coding: 
field must remain administered. 
4. For a T1 site, proceed to 
. For an E1 site, proceed to 
.
T1 Installations Only
1. The 
Framing Mode:
 field is display only.
2. The 
DS1CONV-1 Line Compensation:
 and the 
DS1CONV-2 Line 
Compensation:
 fields are display only. 
3. Remove the 
Facility Circuit ID
 information from the facilities being 
unadministered, if used. Press 
Enter
.
4. A display similar to the following appears after the procedure is 
completed: 
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
E1 Installations Only
1. The 
CRC?
 field must remain administered.
2. The 
Line Termination:
 field is display only.
3. Remove the 
Facility Circuit ID
 information from facilities being 
unadministered, if used. Press 
Enter
.
4. A display similar to the following appears after the procedure is 
completed: 
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.