York R134A Manuale Utente

Pagina di 140
JOHNSON CONTROLS
132
UNIT LOCATION
The YCIV chillers are designed for outdoor installation. 
When selecting a site for installation, be guided by the 
following requirements:
1.  Installation sites may be either on a roof or on ground 
level. (See FOUNDATION) 
2.  Select a place having an adequate supply of fresh air 
for the condensers. Recommended clearances for all 
units are shown on the DIMENSIONS pages.
3.  Avoid  locations  near  windows  or  structures  where 
normal operating sounds may be objectionable.
4.  The standard condenser fans are propeller-type and 
are not recommended for use with ductwork, filters 
or other impedements to airflow in the condenser air 
stream.
5.  When it is desirable to surround the unit(s), it is rec-
ommended that the screening be able to pass the 
required chiller CFM without exceeding 0.1" external 
static pressure. 
6.  Protection against corrosive environments is available 
by supplying the units with either copper fins, or cured 
epoxy-coating on the condenser coils. Epoxy-coated 
coils should be utilized with any units being installed at 
the seashore, or where salt spray may hit the units, or 
where acid rain is prevalent (copper condenser coils 
are not recommended where they may be exposed 
to acid rain).
7.  On installations where winter operation is intended and 
snow accumulations are expected, additional eleva-
tion must be provided to insure normal condenser air 
flow.
FOUNDATION
The unit should be mounted on a flat and level founda-
tion,  ground  or  roof,  capable  of  supporting  the  entire 
operating weight of the equipment. Please contact your 
nearest Johnson Controls Sales Office for shipping and 
operating weights.
Roof  Locations  –  Adequate structural strength to safely 
support the entire weight of the unit and service person-
nel must be provided. Care must be taken not to damage 
the roof during installation. If the roof is “bonded”, consult 
building contractor or architect for special installation re-
quirements. Roof installations should incorporate the use 
of spring-type isolators to minimize the transmission of 
vibration into building structure. Additional support should 
be provided to the roof at the spring-isolator locations.
Ground Locations  –  Units must be installed on a sub-
stantial base that will not settle and cause strain on the 
refrigerant lines, resulting in possible leaks. A one-piece 
concrete slab, with footers extending below the frost line, 
is recommended. The slab should not be tied to the main 
building foundation as noises will telegraph.
Mounting holes (5/8") are provided in the base rails for 
bolting the unit to its foundation. See DIMENSIONS for 
location of the mounting holes.
For ground installations, precautions should be taken to 
protect the unit from tampering by, or injury to, unauthor-
ized persons. Fasteners on access panels will prevent 
casual  tampering;  however,  further  safety  precautions, 
such as unit enclosure options, a fenced-in enclosure, or 
locking devices on the panels may be advisable. Check 
local authorities for safety regulations.
CHILLED LIQUID PIPING
The chilled liquid piping system should be laid out so that 
the circulating pump discharges into the cooler. The inlet 
and outlet cooler-liquid connections are given in DIMEN-
SIONS. Hand stop valves are recommended for use in 
all lines to facilitate servicing. Drain connections should 
be provided at all low points to permit complete drainage 
of the cooler and system piping.
A strainer (40 mesh) is recommended for use on the INLET 
line to the cooler, and must be in place at initial operation 
of the water pumps.
Pressure-gauge connections are recommended for instal-
lation in the inlet and outlet water lines. Gauges are not 
provided with the unit and are to be furnished by others.
Chilled  liquid  lines  exposed  to  the  weather  should  be 
wrapped with a supplemental heater cable and insulated, 
or glycol should be added to the chilled liquid to protect 
against freezing if low-ambient periods are expected.
A flow switch is available as an accessory on all units. A 
flow switch must be installed in the leaving water piping 
of the cooler and must not be used to start and stop the 
unit.
Application Data