NorthStar 961 Istruzione Sull'Installazione
SECTION TWO - Installation
961/962 INSTALLATION MANUAL Revision A
Page 23
Figure 12: Stripping the coax cable jacket
2. “Figure 13: Flared cable braid” below: Slide the outer ferrule on as
shown. Slightly flare the end of the cable braid, as shown, to facilitate
insertion into inner ferrule.
insertion into inner ferrule.
Figure 13: Flared cable braid
3. Place the center contact onto the center conductor so that it butts
against the cable dielectric. Crimp the contact in place using
Amphenol tool handle #227-944 and Cavity B of Die Set 227-980-3.
Amphenol tool handle #227-944 and Cavity B of Die Set 227-980-3.
4. “Figure 14: Completed TNC connector” below: Install the cable
assembly into the body assembly so the inner ferrule slides over the
dielectric and under the braid. Push the cable assembly forward until
contact seats in insulator. Slide the outer ferrule over the braid and
up against the connector body. Crimp the outer ferrule using Cavity
A of tools specified above. The connector ferrule-to-cable junction
can be sealed and protected using adhesive-lined heat shrink.
dielectric and under the braid. Push the cable assembly forward until
contact seats in insulator. Slide the outer ferrule over the braid and
up against the connector body. Crimp the outer ferrule using Cavity
A of tools specified above. The connector ferrule-to-cable junction
can be sealed and protected using adhesive-lined heat shrink.
Figure 14: Completed TNC connector
0.57
0.43
0.34
0.14