Cisco Cisco Packet Data Gateway (PDG) Guida All'Installazione

Pagina di 317
Applying Power and Verifying the Installation   
▀  Verifying the Installation 
 
 
▄  ASR 5000 Installation Guide 
158 
   
Verifying the Installation 
When power is applied to the chassis, power is provided to the upper and lower fan trays, and every installed application 
and line card.  
Each PFU, application card, and line card installed in the chassis has light emitting diodes (LEDs) that indicate its 
status. This section describes how to interpret the LEDs to verify that all of the installed components are functioning 
properly. 
Important:
  As the system progresses through its boot process, some cards may have no immediate LED activity. 
Line cards have sporadic Link and Activity LED activity. It is recommended that you allow several minutes to elapse 
prior to checking the LEDs on the various cards to verify the installation.  
Checking the LED on the PFU 
Each PFU has a single status LED labeled POWER. This LED is green during normal operating conditions. 
 
If the LED is not green, use the following troubleshooting information to diagnose the problem. 
Table 49. 
PFU Power LED States 
Color
 
Description
 
Troubleshooting
 
Green  PFU powered with no errors 
detected 
None needed.  
None 
PFU is not receiving power 
Verify that the power switch is in the ON position. 
Verify that the RTN and -VDC lugs are attached properly according to the 
instructions provided in this document. 
Verify that the ground lug is attached properly.