Cisco Cisco Packet Data Gateway (PDG) Guida All'Installazione

Pagina di 317
  Applying Power and Verifying the Installation 
Verifying the Installation  ▀   
 
ASR 5000 Installation Guide  ▄  
 
   
159 
Color
 
Description
 
Troubleshooting
 
Verify that the power source is on and is supplying the correct voltage and sufficient 
current. 
Check the cables from the power source to the rack for continuity. 
If a fuse panel is installed between the Power Distribution Frame (PDF) and the 
chassis, verify that the fuses are intact. 
If a fuse panel is installed between the PDF and the chassis, check the cables from the 
fuse panel to the chassis for continuity. 
If all of the above suggestions have been verified, then it is likely that the PFU is not 
functional. Please contact your service representative. 
 
Checking the LEDs on the SMC(s) 
Each SMC is equipped with the following LEDs as shown in the following figure: 
 
Run/Fail 
 
Active 
 
Standby 
 
Status 
 
Service 
 
Busy 
The possible states for all SMC LEDs are described in the sections that follow.