Cisco Cisco UCS B200 M4 Blade Server Scheda Tecnica
Cisco UCS B260 M4 Blade Server (with Intel® Xeon E7 v3 CPU)
56
SUPPLEMENTAL MATERIAL
In
, two ports from the VIC 1340/1240 are channeled to Fabric Extender A and two are channeled
to Fabric Extender B. The Port Expander Card installed in adapter slot 2 acts as a pass-through device,
channeling two ports to each of the Fabric Extenders. Adapter slot 3 is empty. The result is 40 Gb of
bandwidth to each Fabric Extender.
channeling two ports to each of the Fabric Extenders. Adapter slot 3 is empty. The result is 40 Gb of
bandwidth to each Fabric Extender.
Figure 16
VIC 1340/1240 and Port Expander in Adapter Slot 2 (adapter slot 3 empty)
In
, two ports from the VIC 1340/1240 adapter are channeled to Fabric Extender A and two are
channeled to Fabric Extender B. UCS storage accelerators are installed in adapter slots 2 and 3, but provide
no network connectivity. The result is 20 Gb of bandwidth to each Fabric Extender.
no network connectivity. The result is 20 Gb of bandwidth to each Fabric Extender.
Figure 17
VIC 1340/1240 with UCS storage accelerators installed in adapter slots 2 and 3