Cisco Cisco Packet Data Gateway (PDG) Documentation Roadmaps

Pagina di 1034
Serving Gateway Overview   
▀  Features and Functionality - Base Software 
 
▄  Cisco ASR 5000 Series Product Overview 
OL-22937-01   
Network Operation Management Functions 
This section describes the following features: 
 
 
  
 
  
 
  
 
  
 
Support Interfaces (Reference Points) 
 
S1-U (E-UTRAN EPC)
 
In an E-UTRAN network S1-U is the per-bearer user plane tunneling reference interface between the S-GW and 
eNodeB. The S-GW provides the local mobility anchor point for inter-eNodeB hand-overs. It provides inter-eNodeB 
path switching during hand-overs when the X2 handover interface between base stations cannot be used. The S1-U 
interface uses GPRS tunneling protocol for user plane (GTP-Uv1). GTP encapsulates all end user IP packets and it relies 
on UDP/IP transport. 
 
In order to support S1-U hand-overs the source eNodeB initiates the hand-over by sending the hand-over required 
message over the S1-MME interface to the MME. The MME then determines if the S-GW needs to be relocated. The 
eNodeB decides which EPS bearers are subject to forwarding to the target base station. In the S1-U hand-over, the hand-
off occurs indirectly from the source eNodeB to the target via the source and target S-GWs. 
 
S11 (E-UTRAN EPC)
 
S11 is the reference interface that provides the control plane protocol (GTP-Cv2) between the MME and S-GW. As with 
all GTP-based interfaces S11 relies on UDP/IP transport. A GTP tunnel is identified in each node with a Tunnel 
Endpoint ID (TEID), IP address and UDP port number. The TEID values are exchanged between the tunnel endpoints 
using GTP-C. There is one GTP-C tunnel between the MME and S-GW for each mobile terminal. The GTP protocol 
provides the following functions: 
 
 
Bearer management function: This functionality is responsible for bearer management; setting up, modifying 
and releasing EPS bearers, which are triggered by the MME. The release of EPS bearers may be triggered by 
the P-GW or HSS as well. The messages include Create Session request, Create Bearer request, Create bearer 
response etc. Additionally GTP tunnel management messages may be sent for any of the following reasons: 
 
Initial UE attachment 
 
UE requests connection to an additional PDN 
 
Tracking Area Update with S-GW change 
 
S1/X2 handover with S-GW change 
 
GERAN or UTRAN to E-UTRAN Inter-RAT handover with SGW change.