Cisco PowerKEY CableCARD Module 805 Guida All'Installazione
Appendix C
Provision the PCG
88
78-4017672-01 Rev E
Provisioning a PCG
Important: For complete instructions on provisioning the PCG, refer to Configuring
the PowerKEY DVB System for System Release i4.2.1 (part number 4017650) and the
DNCS Online Help for System Release i4.2.1 (UNIX Version) (part number 4026560).
the PowerKEY DVB System for System Release i4.2.1 (part number 4017650) and the
DNCS Online Help for System Release i4.2.1 (UNIX Version) (part number 4026560).
Provisioning from the PCG User Interface
When you edit settings from the PCG user interface, data is sent to the DNCS/ISDS.
After the PCG is reset, the DNCS/ISDS responds by appropriately provisioning the
PCG according to the new settings.
After the PCG is reset, the DNCS/ISDS responds by appropriately provisioning the
PCG according to the new settings.
Provisioning from Ethernet Setting
Ethernet settings are used to communicate with the SCS(s), which can provision the
PCG with scrambler/SCS device IP addresses, and parameters such as the maximum
number of scrambling control groups (SCGs).
PCG with scrambler/SCS device IP addresses, and parameters such as the maximum
number of scrambling control groups (SCGs).
Unsolicited Provisioning
When a configuration change is entered into the PCG manager on the DNCS/ISDS,
unsolicited provisioning is "pushed" to the PCG.
unsolicited provisioning is "pushed" to the PCG.