Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Guida All'Installazione
Installing Accessories
slot. For a list of available accessory pad values and part numbers, refer to
Technical Information (on page 105).
4 Install other options or accessories as desired or proceed to
Installing the
Amplifier Module (on page 37).
To Install the Crowbar Surge Protector
Complete the following steps to install the crowbar surge protector in the amplifier.
1 Open the node housing. Refer to
1 Open the node housing. Refer to
To Open the Node Housing (on page 17).
2 Using a Torx T-15 bit screwdriver, remove the amplifier cover by loosening the
amplifier cover screws.
3 Install the crowbar surge protector in the surge protector slot. Refer to the
following illustration.
Note:
Make sure that all the pins on the crowbar surge protector bottom align with
the pin holes in the surge protector slot, allowing the surge protector to
install flat against the amplifier module.
Make sure that the components face the outside of the station (see the
preceding diagram for proper positioning). Heat shrink tubing has been
OL-30326-02
33