Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 180
 
Installing Accessories 
slot. For a list of available accessory pad values and part numbers, refer to 
Technical Information (on page 105). 
4  Install other options or accessories as desired or proceed to 
Installing the 
Amplifier Module (on page 37). 
 
To Install the Crowbar Surge Protector 
Complete the following steps to install the crowbar surge protector in the amplifier. 
1  Open the node housing. Refer to 
To Open the Node Housing (on page 17). 
2  Using a Torx T-15 bit screwdriver, remove the amplifier cover by loosening the 
amplifier cover screws. 
 
3  Install the crowbar surge protector in the surge protector slot. Refer to the 
following illustration. 
 
Note: 
 
Make sure that all the pins on the crowbar surge protector bottom align with 
the pin holes in the surge protector slot, allowing the surge protector to 
install flat against the amplifier module. 
 
Make sure that the components face the outside of the station (see the 
preceding diagram for proper positioning). Heat shrink tubing has been 
 
OL-30326-02 
33