Cisco Cisco StadiumVision Director Guida All'Installazione

Pagina di 71
© 2011 Cisco Systems, Inc. All rights reserved   
Page 15 of 71 
 
b.  Select the language in which you would like to read the document. 
c.  Click Go. The Cisco warranty page appears. 
d.  Review the document online, or click the PDF icon to download and print 
the document in PDF. 
Duration of Hardware Warranty 
Ninety (90) days. 
Required Tools and Equipment 
Caution! The fastener pack, within the rack-mount kit, contains eight rack 
screws. You must check these screws to ensure that they are the appropriate 
size for the holes in your rack. Using the wrong-sized screws for your threaded 
rack holes can damage the rack.  
You need the following tools and equipment to install the SV Director Server in a 
4-post rack: 
Warning! Only trained and qualified personnel should be allowed to install, 
replace, or service this equipment. Statement 1030 
  ESD-preventive cord and wrist strap. 
  Number 2 Phillips screwdriver. 
  Flat-blade screwdrivers: small, 3/16-inch (0.476 cm) and medium, 1/4-inch 
(0.625 cm) to remove the cover, if you are upgrading memory or other 
components. 
  4-Post Rack-Mount Hardware Kit (included) 
  Cables for connection to the LAN ports (depending on the configuration). 
  Ethernet hub or PC with a network interface card for connection to the 
Ethernet (LAN) port or ports. 
  Console terminal (an ASCII terminal or a PC running terminal-emulation 
software) that is configured for 9600 baud, 8 data bits, no parity, 1 stop bit, 
and no hardware flow control. 
  Console cable for connection to the serial (console) port. 
Installation Checklist 
To assist you with your installation and to provide a historical record of what was 
done, and by whom, use the following Installation Checklist. Make a copy of this 
checklist and mark the entries as you complete each task.