Cisco Cisco StadiumVision Director Guida All'Installazione

Pagina di 71
© 2011 Cisco Systems, Inc. All rights reserved   
Page 17 of 71 
 
Chapter 3   Installation 
To achieve system redundancy for the SV Director Server, the hardware 
requirements are as follows: 
  Dual Power Supply Units (PSUs) 
  Dual CPU 2.33 GHz 
  Dual 2 GB RAM (total of 4 GB) 
  Dual 147 GB hard disk drive (configured as RAID-1) 
To install the SV Director Server, you will need to do the following: 
1. 
2. 
3. 
4. 
Removing the Chassis Cover 
Warning! Before performing any of the following procedures, ensure that power 
is removed from the DC circuit. Statement 1003 
Warning! 
 
Before working on a chassis or working near power supplies, unplug 
the power cord on AC units. Statement 246 
Note: 
 
A nonskid surface or a stop behind the appliance may be needed to 
prevent the unit from sliding on your work surface. 
To remove the cover: 
1.  Review the 
. 
2.  If already powered on, power down the unit and all external devices. 
Disconnect the AC power cord or DC power source and all external cables. 
3.  Attach the antistatic wrist strap to your wrist and connect its cord to the ESD 
socket on the top, left-hand side on the front of the appliance. 
4.  Remove the shipping screw, if present. 
5.  While pushing in and holding the blue button at the top of the chassis (see 
location 1 in Figure 14), slide the top cover back until it stops.