Honeywell C7035 Manuale Utente

Pagina di 12
C7027A, C7035, C7044A, C7927A MINIPEEPER® ULTRAVIOLET FLAME DETECTORS
60-2026—11
8
Fig. 8. Mounting C7044A Detector on blast tube.
The C7044 is mounted in a 29/32 in. (23.0 mm) hole in the 
blast tube. The mounting bracket is fastened to the blast tube 
with 2 screws on 1-27/64 in. (36.1 mm) centers.
The mounting bracket is designed so that the detector can be 
removed from the blast tube for cleaning and then replaced 
without disturbing the sighting angle. Loosen the 2 screws 
holding the bracket to the blast tube, but do not loosen the 
clamp screw on the bracket. Twist both the bracket and 
detector to remove them.
WIRING (ALL MODELS—FIG. 10)
CAUTION
Equipment Damage Hazard.
Can cause improper operation.
The blue (tan with blue tracer with C7035A1080) 
leadwire must be connected to the F terminal of the 
flame safeguard control subbase or terminal strip 
and the white (tan leadwire without blue tracer with 
C7035A1080) to the G terminal (see Fig. 10). 
Failure to observe the circuit polarity by reversing 
the leadwires (even momentarily) may cause the 
flame detector to improperly supervise the combustion 
flame.
IMPORTANT
All wiring must comply with applicable local electrical 
codes, ordinances and regulations. Use NEC Class 
1 wiring.
The detector has color-coded and labeled, plastic-insulated, 
no. 18 AWG leadwires, eight ft. (2.44 m) long, rated for 221°F 
(105°C).
1. Keep the flame signal leadwires as short as possible 
from the flame detector to the terminal strip or wiring 
subbase. Capacitance increases with wire length, 
reducing the signal strength. 
NOTE: The maximum permissible leadwire length depends 
on the type of leadwire and the conduit type and 
diameter. The ultimate limiting factor in flame signal 
leadwire length is the signal current or voltage at the 
flame safeguard device. See Table 1.
2. If needed, splice detector leadwires for longer leadwire 
runs, observing the following considerations:
a. Make required splices in a junction box.
b. Use moisture-resistant no. 14 wire suitable for at 
least 167°F (75°C). 
c. For high temperature installations, use Honeywell 
Specification no. 32004766-003 or equivalent for 
the F leadwire. This wire is rated up to 400°F 
(250°C) for continuous duty. It is tested for operation 
up to 20 Kv and for breakdown up to 35 Kv. For the 
other leadwires, use moisture-resistant no. 14 wire 
selected for a temperature rating above the 
maximum operating temperature.
d. F and G wires must be run in their own conduit 
independent of other power carrying leadwires. 
More than one scanner F and G wire can be run in 
the same conduit.
e. A shielded twisted pair wire may be substituted for 
using conduit for routing the F leadwire. Be advised 
of the capacitance per foot of shielded wire 
effectively reduces the flame signal at the flame 
safeguard device. Be sure to ground the shield to 
the G terminal at the flame safeguard wiring 
subbase. 
f. The detector wires need to be run in their own 
conduit as well, avoiding other electrical noise 
carrying wiring.
1-27/64 IN.
(36.1 mm)         
8-32 RHIS
(EUROPEAN M-4)
SCREW (2)
29/32 IN. (23.0 mm)
MOUNTING HOLE
IN BLAST TUBE        
MOUNTING
BRACKET
C7044A
DETECTOR
CLAMP
SCREW
M3020