Essence Security International ltd. ES7000EG Manuale Utente
Installation
EverGuard Control Panel
7
In order to use the DVK RF test tool, the control panel location should be
selected first. The installer can then use the DVK tool to select the
location for all other devices.
location for all other devices.
To mount the ES7000EG control panel:
1. Identify a suitable location for the ES7000EG control panel according to the
guidelines above.
2. Remove the wall mount component from the ES7000EG control panel.
3. Place and hold the wall mount component on the desired mounting location.
Mark the desired drilling locations, using the four holes as shown below.
4. Using a drill with the appropriate drill bit, drill at the marked drilling locations.
5. Using the appropriate screwdriver, insert the four screws into the appropriate
locations on the wall mount component and secure them.
6. To open the ES7000EG control panel, use a large coin. Insert the coin into the
depression on the lower side of the panel. Twist the coin and the cover
separates from the main body.
separates from the main body.
7. On the ES7000EG control panel main body, create an opening for the power
cable by removing the punch-out according to the figure below.