Triton RAB-PO-X68-XN Manuale Utente

Pagina di 156
104
RFa
RFA WAll-MOUNTED CABINET
 DESCRIPTION, PURPOSE OF USE
 
• 19“ one-sectioned wall-mounted cabinet with IP 30 protection
  • Three separate 19‘‘ sections
  • Cabinet is to be hanged right on the wall..
  • Cabinet includes two adjustable sliding vertical rails in each section.
  • Cabinet construction:
    – welded frame
    – glass door: safety hardened glass, thickness 5 mm
    – metal door
  • Max. permissible load of the door is 10 kg.
  • Min. thickness of the surface finish is 65 µm.
  • Cabinets  are  intended  for  installation  of  data  and  telecommunication  devices  and  their 
distribution systems.
  • The frame of the cabinet and all the removable parts are connected with earthing cables 
that have to be properly fixed and inserted into connectors during all the time when using 
the cabinet.
  • There is one M8 screw placed on the bottom part of the cabinet as an earthing main point.
  • Cable openings covered with breakout-type blanking panels are placed in the top and the 
bottom part of the cabinet rear side, others are in the top and the bottom side of cabinet..
  • Openings  covered  by  break-out  blanking  panels,  prepared  for  installation  of  2  cooling 
ventilators, are placed in the metal door of the first section.
 
OPERaTION CONDITIONS
 
• Operation environment:
    – office
    – the cabinet is not intended for outdoor installations and for installations in environment 
that can influence negatively the functionality of the cabinet and the mounted devices 
(e.g. environment with danger of explosion or humid and wet surroundings)
  • Must be protected against:
    – mechanical damage
    – improper manipulation
    – a different usage than the cabinet is intended for
  • Improper manipulation is especially:
    – overloading (maximum recommended load exceeding)
    – device installation that can influence negatively operation and function of the cabinet or 
the installed equipment
    – change of the constructionor design of the cabine
 
INSTallaTION OF THE CaBINET
  • Cabinet is to be hanged on the wall using the screws, dowels and washers (part of a supply).  
Spacing of holes designed for hanging is shown in the scheme.
  • To secure the maximum recommended load, it is necessary to fix the cabinet on the wall 
with an appropriate carrying capacity (brick, concrete or similar) and to distribute the in-
stalled  loading equally.
  • To avoid dust penetration in a case where cables lead through some of the cable openings, 
you can seal it using a blanking panel with a brush which is a part of the cabinet supply.
 ENVIRONMENT PROTECTION
  • All parts are made of recyclable materials and after its discard, it is necessary to dispose the 
cabinet according to valid regulations.
 CERTIFICaTE aND CONFORMITY
  • This product is fully in accordance with ČSN eN 62208 (357040), (eN 62208:2003), 
(idt IeC 62208:2002)