Aperto Networks PM365-BS Manuale Utente

Pagina di 150
3–2
PacketMax 5000 Installation and Operation Manual,   10007678 Rev J
Chapter 3.  Installing the Base Station IDU
3.1 Planning, Site Preparation, and Installation
Before you begin installing the PacketMax equipment, make sure you properly plan 
the overall system and individual sites.
 
 shows a list of the tool kit that Aperto recommends.
Step 1.  Determine and Prepare Locations
A. Make sure the base station is located such that it can communicate with subscrib-
ers.
Table 3-A
Tool Kit
Description
Manufacturer
Manufacturer 
Part Number
Blue Nylon Tool Case, 18 Inches
Ideal
35-418
Crimp Tool for LMR300/400 connectors
Times Micro-
wave
CT-300/400
3190-406 DEBURRING TOOL FOR LMR400/500/600
Times Micro-
wave
DBT-01
Cable Preparation Tool for LMR-400 attachment of 
CRIMP-style connectors.
Times Micro-
wave 
ST-400EZ
Plastic Pipe Scissors Cutter, Capacity 1 1/4 Inches, 
Replaceable Stainless Steel Folding Cutting Blade
Rigid
BK125S
Type-F Male Connectors
Times Micro-
wave
EZ-400-FM-75
Philips #2 Screw Driver, 6 " long with handle
Any
Any
Ideal 62-202 MiniTracker Coax Tester
Ideal Indus-
tries
62-202
Tie Wraps, 11 Inches Long, Nylon, Black,UV Protective
 Vision Plastics 
11-75-UV-100
Tubing, Cold Shrink, .31" to .56" Diameter
3M
8423-6
Tool, Crimpers, Cutters, All Purpose
 Klein Tools
1002
Wire, Hook-Up, 10AWG, Green/Yellow
Manhattan 
Wire Product
M218-54