RadioFrame Networks Inc MCSERIESHP10 Manuale Utente
MC-Series High-Power System
System Configuration Changes
998--01 Rev X1
RadioFrame Networks, Inc.
CONFIDENTIAL AND PROPRIETARY 115
Table 39 Handover and Reselection Test Worksheet
Test #
Handover (Mobile #)
Carrier # from (HEX)
Carrier # to (HEX)
1
2
3
Cell Reselection (Mobile #)
1
2
3
D.5 Interconnect Connection Stability and SQE Performance
A single link for 3:1 Interconnect should be maintained for 30 minutes each. Table 40
presents the data to be collected for each selected link. The iDEN Field Test Application
(IFTA) is be used in “Single Cell” mode to observe the SQE performance and plotted over
time.
presents the data to be collected for each selected link. The iDEN Field Test Application
(IFTA) is be used in “Single Cell” mode to observe the SQE performance and plotted over
time.
Table 40 Interconnect Connection Stability Worksheet
Interconnect #1
Carrier #
RSSI (dBm)
SQE (dB)
Sector
Duration (min)
30
Interconnect #2
30
Interconnect #3
D.6 Dispatch Connection Stability
To verify Dispatch connection stability, a Dispatch (private or group) call should be
maintained for several minutes. Table 41 presents the data to be collected for each
dispatch call.
maintained for several minutes. Table 41 presents the data to be collected for each
dispatch call.
Table 41 Dispatch Connection Stability Worksheet
Dispatch #1
Carrier #
RSSI (dB)
SQE (dB)
Sector
Quality (1-
5)
Duration (min)
3
Dispatch #2
4
Dispatch #3
5
D.7
Idle SQE Testing and Validation
Using the iFTA tool in “Single Cell” mode, record the idle RSSI and SQE values for the
control channel for at least one hour per sector, while the mobile remains fixed.
control channel for at least one hour per sector, while the mobile remains fixed.
Then, conduct the same procedure while walking the facility for approximately 15
minutes.
minutes.