ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
Chapter 3 Installation Preparation
Equipment Room Environment
Requirements
Equipment
Room Layout
Requirements
The layout of equipment room includes cable tray layout and cabi-
net layout. According to the engineering design drawing, installa-
tion personnel should mark and locate based on equipment room
space and cabinet dimension.
The direction from feeder to cabinet should be considered enough
during cabinet layout. The feeder should be short as possible as
it can, and the bending radius of feeder should be not too small.
If two cabinets or more are required, the main cabinet should be
put in the middle of all cabinets.
Cabinet layout adopting a row or multi-rows (put in the same
equipment room with
or
MSC
) is determined by the size of
equipment room and cabinet quantity.
In order to be convenient for operation, suggest that cabinet layout
should meet the following requirements:
The distance from cabinet to wall should be more than 10 cm.
A row of cabinets keeps 1m distance at least from another
neighboring row of cabinets.
When multiple cabinets are put side by side, these cabinets
should keep in line.
The face of cabinet keeps 1m distance at least from an ob-
struction.
Equipment Room
Building
The engineering for equipment room must meet the following re-
quirements:
The level floor difference per square meter is not more than 2
mm.
The floor, wall, ceiling, reserved installation holes and grooves
of equipment room should accord with the design require-
ments.
Prevent water on the outdoor floor into the indoor floor while in-
stallation holes passes an outdoor wall. Take measures against
dampness for the grooves.
Select some material which is difficult to deform and crack for
hidden pipes, holes and slots between cover plates.
Prepare a temporary room to store installation materials and
devices.
Confidential and Proprietary Information of ZTE CORPORATION
13