ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
Chapter 3 Installation Preparation
Different power sockets in the equipment room should have
obvious marks. The power electricity should be distinguished
from the lighting electricity obviously.
When the phenomena of power undercurrent, under-voltage
and over-voltage occur, there should be sound-and-light
alarms.
While using 220V or 380V AC voltage, pay great attention in
case of electric shock.
While installing DC power, make sure power polarities consis-
tent.
Electric Shock:
While checking powers, examine the current status of all switches
and watch out electric shock.
Lightning and Grounding
Requirements
The lightning and grounding in the equipment room should meet
the following requirements:
The grounding resistance is not more than 5 Ω.
The indoor grounding system connects directly with a ground-
ing bar. All device grounding connects to this grounding bar.
And then the grounding bar connects with the primary ground-
ing bar of the building.
Transmission Requirements
The external interfaces of ZXSDR BS8800 C200 locate on the
modules and
subsystem, referring to
.
T
ABLE
3 ZXSDR BS8800 C200 E
XTERNAL
I
NTERFACE
I
NDEX
D
ESCRIPTION
Tran
smis
sion
Categ
ory
M
odule
Inte
rface
Name
Conn
ector
Description
E1/T1
S
A-d
ata
cable
B2 inter
face
DB44
Connects the ZXSDR BS8800
C200 with the BSC;
E1 provides 75Ω and 120Ω load
interfaces;
T1 provides 100Ωload interface.
Confidential and Proprietary Information of ZTE CORPORATION
15