ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
ZXSDR BS8800 C200 Installation Manual
Tran
smis
sion
Categ
ory
M
odule
Inte
rface
Name
Conn
ector
Description
ETH0
RJ45
Connects the ZXSDR BS8800
C200 with the BSC.
Ethe
rnet
cable
CC
ETH1
RJ45
Connects the ZXSDR BS8800 C200
and PC for
maintenance.
RS232/
RS485
monit
oring
cable
S
A-d
ata
cable
B4
DB9
Provides internal and external
environment monitoring for
ZXSDR BS8800 C200.
Dry
contact
cable
S
A-d
ata
cable
B3
DB25
Import dry contact signal from
external devices;
Export dry contact signal from this
device.
AISG
control
cable
RSU
AISG
DB9
Controls electrical adjustment
antenna.
GPS
jumper
CC
ANT
SMA
Import satellite signal into the
cabinet.
Wiring Requirements
Wiring
Requirements
Before layout of power cable and protective ground cable, wrap
cable connectors well with insulation adhesive tape.
The power cable and protective ground cable should be sepa-
rate from the signal cable.
When the power cable and protective ground cable are parallel
with the signal cable, the distance from the signal cable keeps
10 mm at least inside the cabinet and 100 mm at least outside
the cabinet.
If the signal cable is crossed with the power cable, the crossed
angle must be 90°.
At the turning of cable, the bending radius should be more than
five times of the cable diameter.
When the power cable connects to a connecting terminal of
distribution power box inside the cabinet, the wiring should be
straight and the radian of turning should be smooth.
The actual installation position of cables should be consistent
with requirements of engineering survey and data configura-
tion.
The rout of cable layout should be clear and reasonable, ac-
cording to the engineering design drawing.
The layout of signal cable should be orderly, smooth and non-
crossed.
The layout of cables should be convenient for maintenance and
capacity expansion.
16
Confidential and Proprietary Information of ZTE CORPORATION