ZXSDR BS8800 C200 Installation Manual
4. Check the goods within the carton.
Note:
Avoid damaging the antistatic bag (It can be used in the
future for storage of spare parts) during unpacking.
While the equipment is moved to a hotter and damper
place, wait for 30 minutes before unpacking the equipment.
Otherwise, moisture may condense on the surface of the
equipment and cause damage.
Properly dispose of recycle desiccants.
E
ND OF STEPS
.
Acceptance and Goods Handover
Context
Perform this procedure for accepting goods, and handing them
over to operators.
Steps
1. Acceptance
Based upon the name, category and number mentioned on the
shipping list, carefully check the goods piece by piece. Make
sure that goods fulfil the following conditions:
i.
Make sure that there are no bubbly, peeling, nick and filth
mark on the surface of the chassis.
ii. Ensure that oil paint on the chassis surface is intact.
iii. Ensure clamping screws are tight and intact.
iv. All the components are properly installed at their respective
positions.
v. Lay down the inspected goods according to categories.
2. Handover
After completing the unpacking procedure, representative of
customer and project supervisor should approve and sign Un-
packing for Inspection Report
. Each party should have a copy
of Unpacking for Inspection Report. If the goods are still un-
der the supervision of the operator even after acceptance, then
goods will not be handed over to the operator until both parties
sign on the report.
E
ND OF STEPS
.