ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
ZXSDR BS8800 C200 Installation Manual
F
IGURE
5 C
ABINET
I
NSTALLATION
F
LOW
Installing Single-cabinet
Steps
1. Confirm the installation position of cabinet based on the ref-
erence dimension and cabinet dimension given by the engi-
neering design drawing. Measure some marking points with a
measuring tape and draw two straight lines paralleled with the
reference line with an inking pot. Make sure the hole positions
for cabinet installation on the straight lines according to the
design drawing. The position of single-cabinet is as shown in
.
24
Confidential and Proprietary Information of ZTE CORPORATION