ZTE Corporation BS8800C200 Manuale Utente

Pagina di 167
ZXSDR BS8800 C200 Installation Manual
For installing antenna with a pole, the distance between poles
should accord with the requirements of engineering design. In
the same sector, a horizontal diversity distance of two 900 MHz
receiving antennas maintains 4 m~6 m, and that of two 1800
MHz receiving antennas maintains 2 m~3 m. If there are other
types, comply with the design document.
On the iron tower, usually install the antenna pole on the en-
closure of platform, more than 1 m away from the tower body.
Complete antenna installation and check whether the pole is
vertical with the level, an error not over 1°.
Install the antenna pole close to the edge of building top pos-
sibly. While selecting a direct fixation mode on the side of wall,
make sure that the wall can support adequate intensity.
While adopting a direct fixation mode on the building top, make
a cement base and prevent drilling on the building top from
causing a fault of waterproof equipment.
Cable Tray
In order to insure equipment security, the following must be per-
formed during installing:
Adopt a standard cable tray with 400 mm width in the equip-
ment room. The cable tray is usually installed above the cabi-
net at a vertical distance of 2600 mm from the floor of equip-
ment room. After installation completion, make sure that the
whole cable tray is unmovable.
The lengths left of expansion bolts should be consistent. After
screwing down nuts, remain a section of expansion bolt with 5
mm or more than two circles.
The paint colors of cable tray keep consistent.
The indoor cable tray should be grounded at interval of 5 m.
After installation completion, perform an electric test and make
sure grounding reliable.
Checking Incoming Material
Steps
1. Check whether the packing of feeder and installation acces-
sories are intact.
2. Check material appearance and make sure it undamaged.
3. Check whether the quantity and dimension of materials accord
with the requirements of packing list.
4. Before installation, make sure all material saved according to
the requirements.
E
ND OF STEPS
.
80
Confidential and Proprietary Information of ZTE CORPORATION