Making Feeder Connector
Context
Make feeder connectors on site. Suggest that connectors installed
at the tower should be prepared and wrapped with sponge before
hang installation.
If a feeder connector is not made completely, or is a made connec-
tor but not connected with the jumper, perform simplified water-
proof processing for it. There are two feasible processing methods:
wrap the connector with waterproof adhesive tape, or after cover-
ing a plastic bag wrap it with waterproof adhesive tape again.
Steps
1. Straighten an end of connector.
Then cut and strip off the
feeder sheath at a 50 mm position off the end, as shown in
.
F
IGURE
61 S
TRIP OFF
S
HEATH
2. Put the feeder connector into a slot of cutting tool and make
this slot close to the feeder sheath possibly. Close the cutting
too slowly and press it slightly. Facing the feeder port, rotate
the cutting tool clockwise until the front blade cuts off the inner
and outer conductor completely. Rotate two circles with slight
pressure again and make sure the back blade exscinding the
feeder sheath.
3. Put an O-type ring in the first wave trough of outer conduc-
tor, outside the feeder sheath and cover a layer of lubricating
oil. Locate the side with screw thread outwards, cover a fas-
tening piece through the connector and push it to the position
where one wave trough on the outer conductor is uncovered,
as shown in
F
IGURE
62 O-
TYPE
R
ING
L
OCATION
Confidential and Proprietary Information of ZTE CORPORATION