ZTE Corporation BTSBI119 Manuale Utente
Chapter 6 Grounding System Installation describes the installation procedure of the
BTSB grounding system.
Chapter 7 Cable Installation in Cabinet introduces the types of BTSB cabinet
internal cables, and describes the installation procedure of them.
Chapter 8 Trunk Cable Installation describes the installation procedure of the BTSB
trunk cables, and explains how to prepare the E1 cables and how to convert the 75
Ω
trunk cables into the 120
Ω trunk cables.
Chapter 9 Monitoring System Installation introduces the composition of the
monitoring system and describes its installation procedure.
Chapter 10 Main Antenna Feeder System Installation describes the installation
preparation, the installation flow and the specific installation procedure of the main
antenna feeder system, and explains how to check and test the antenna feeder and how
to conduct waterproof treatment on the connector.
Chapter 11 GPS Antenna Feeder System Installation describes the installation
preparation, the installation flow and the specific installation procedure of the GPS
antenna feeder system.
Chapter 12 Board Installation describes the types and functions of boards used in the
BTSB system, and how to install and replace them.
Chapter 13 Hardware Installation Check describes the hardware installation check
requirements of the BTSB system.
Chapter 14 Power-on/Power-off describes the check prior to the BTSB power-on, and
the detailed power-on and power-off operation procedures.
Appendix A - Appendix D gives supplementary information on the BTSB technical
performance indices and board indicators, and an abbreviation form.
Conventions
Describing notational conventions, keyboard operation convention, mouse operation
convention and four safety signs.
1. Notational
conventions
Angular brackets "<and>" identify names of keys and buttons, and the
information typed by an operator from a terminal. Square brackets "[and]"